Gates & Fencing · Palmdale

Driveway Gates in Palmdale, CA

A Palmdale driveway gate is a steel frame cut to your opening. In a home's front setback it has to swing inward, away from the street, or run as an automated rolling gate. Width, grade and motor plans decide the rest.

Drives in the middle of Palmdale are mostly tract drives, and the choice there is usually one swing leaf, two, or a slide. Swing leaves need arc room behind the opening, on your side of it, and a pad close to level. A slide needs parking room beside the opening instead. Out toward the larger parcels on the east and west edges, openings get wider and the leaf gets heavier, which changes the frame before it changes the look.

Think of the leaf as a lever. It hangs from one post, and the load on that post grows with the weight of the leaf and how far it reaches. A wide single leaf puts the whole span on one post and one pair of hinges. Split the same opening into two leaves and each post carries half the reach. We step the post section up as the leaf widens, and our own rule is at least 36 inches of concrete around a gate post, more under a wide leaf. That number is shop practice, not a code figure.

The city code has a line written for this spot. Under Palmdale Municipal Code 17.86.040, in the required front setback of a home lot, fencing across the driveway must operate as an automated rolling gate or open inward, away from the public right-of-way, and any main gate opens away from the right-of-way too. A pair of leaves that swings out over the sidewalk does not meet it. The wording covers an automated rolling gate, so a manual slide across the drive is a question to put to Palmdale Planning before it is drawn.

Height at the street follows the front setback figures. Anything sight-obscuring stops at 3 feet, and open view fencing may be allowed up to 5 feet. On a lot of 20,000 square feet or more, a 6 foot open view fence may stand in the front setback, and a vehicle gate must be set back at least 20 feet from the property line. The code gives the reason: room to park a vehicle while the gate is closed. On a big parcel that setback moves the posts, the operator pad and the power run well up the drive.

The same section lists what a fence may be made of: engineered wood, masonry, wrought iron, durable vinyl, or other similar durable materials the city approves. It prohibits solid metal. A leaf skinned in flat sheet steel is solid metal, so we do not build one for a Palmdale drive. A welded picket or bar leaf is open steel in the wrought iron style, and that is what we quote here. Take the drawing to Planning before the steel is ordered.

Say at the measure if a motor might come later. The frame, the hinges and the posts get sized for a daily push, and a sleeve goes through the post so wiring has a path. The operator and its wiring are separate trades. A slide in the front setback needs its operator to match the automated rolling wording, so on that design the frame gets planned for the motor from the first cut.

Once the gate is motorized, UL 325 and ASTM F2200 apply, and on a slide gate in Classes I, II or III that means guards on weight bearing exposed rollers 8 feet or less above grade, positive stops at both ends of travel, and screening so a 2.25 inch sphere cannot pass the gate or the fence it covers when open, up to 72 inches above grade or the top of a shorter gate. Those are welded details, far easier in the shop than on a finished leaf.

For the visit, have the opening width, which way the drive falls, where power sits, and your lot area from the parcel record. Lot area matters here because 20,000 square feet is where the front setback rules change, including how far back a vehicle gate sits.

This work runs out of our shop on Division Street in Lancaster. Read the full driveway gates details, or call (818) 220-8704 and we will come out.

FAQ

Questions about driveway gates in Palmdale

My drive climbs from the street. Should I pick swing or slide?

Often a slide. A swing leaf that opens inward sweeps up the rise, and the bottom rail meets the concrete partway through that arc unless the leaf is hung high, which leaves a gap underneath. A slide travels across the opening, so the grade under the leaf matters less than a clear strip beside the drive for the leaf to park in. In a Palmdale front setback that slide should be motorized, since the code names an automated rolling gate. We check the fall at the visit and show you where a swing leaf would touch.

My old gate swings out toward the street. Does a new one have to swing in?

In the front setback of a home lot, yes. Fencing across the driveway must open inward, away from the public right-of-way, or be an automated rolling gate. We will not tell you how the city treats a gate that was hung before the rule. When we build the new one, the leaves swing in, and we check that the arc clears the rise of the drive and anything parked inside.

How tall can a gate be at the front of a Palmdale lot?

Anything sight-obscuring in the required front setback stops at 3 feet. Open view fencing may be allowed up to 5 feet, and on a lot of 20,000 square feet or more a 6 foot open view fence may stand there. An open picket leaf is built to those figures. Before planning a leaf taller than them, ask the city how it measures a gate.

Can my driveway gate be solid for privacy?

Not in steel. Palmdale Municipal Code 17.86.040 prohibits fencing made of solid metal, and a leaf faced in flat sheet is solid metal wherever it hangs. In the front setback, anything sight-obscuring would also stop at 3 feet. An all picket leaf fits both rules, and it catches far less wind, so the hinges and post work less.

What moves the price of a driveway gate?

Width first. A wider leaf needs a heavier frame, bigger hinges and heavier posts. Infill comes next: picket size, spacing and any decorative work change the steel count and the welding time. Slide versus swing changes the hardware list. Motor prep adds a mounting plate, sleeves and, on a slide, guards and stops. Galvanizing and powder scale with the surface area. We price after the measure, not from a photo.

Who pulls the permit for a new gate in Palmdale?

The property owner or the contractor of record. The city requires a building permit for a new fence, wall or screening over 6 feet, and it decides what else needs one. Ask before work starts if the gate comes with a motor or new pilasters, since those bring other trades onto the job.

My parcel is on the rural edge of town. What changes?

Mostly width and exposure. A bigger parcel often needs room for a truck, a trailer or equipment, so the opening grows and the leaf gets heavier. A long open drive also puts more wind across the leaf. Check your lot area too: at 20,000 square feet or more, a 6 foot open view fence may stand in the front setback, and a vehicle gate has to sit at least 20 feet back from the property line.

Do I need a slide gate to fit an RV through?

Not always. An RV needs clear width and clear height through the opening, and a pair of swing leaves gives that when there is arc room inside. A slide makes sense when the arc would cross a parked car, a slope or a planter. Measure the widest thing that will pass, then allow for the turn in from the street.

I might automate the gate in a few years. What should happen now?

Tell us at the measure. We size the frame, hinge points and posts for the load, plan where the mounting plate goes, and run a sleeve through the post for wiring. The operator and its electrical work belong to other trades. When the motor goes on, UL 325 and ASTM F2200 apply from that day, and a frame planned for it does not have to be cut apart to meet them.

Does wind change how a Palmdale gate is built?

It changes the infill more than anything. A solid leaf presents its whole face to a gust and hands that force to the hinges and the post. Pickets let most of the air through. Palmdale's ban on solid metal fencing keeps a steel leaf open, which trims that load on its own.

Is chain link an option for the gate at my drive?

No. Palmdale prohibits chain link in residential and mixed-use zones unless it is temporary fencing, such as around a construction project. For a permanent gate at a home, welded picket steel in the wrought iron style is the steel option, and wrought iron is on the code's list of acceptable materials.

What finish holds up best on a gate facing the afternoon sun?

Galvanizing with an AAMA 2604 class powder over it. Ask whether the galvanized parts get the ASTM D7803 thermal prep before powder, since skipping it leaves pinholes. Paint alone costs less and touches up easily, but it needs attention far sooner. The city also expects a fence to be kept with no sign of rust or disrepair, so the finish is part of the upkeep.

Need driveway gates in Palmdale?

Free estimates. We come measure the opening or the property line first.